-2.1 C
New York City
Tuesday, April 16, 2024
Home NEWS Nigeria FG Reopens Lagos Third Mainland Bridge

FG Reopens Lagos Third Mainland Bridge

The federal government early this morning reopened to traffic the Lagos third Mainland Bridge 24 hours ahead of schedule.

The Federal Controller of Works Lagos, Mr Olukayode Popoola, who hinted on the planned reopening on Sunday, said the total shutdown had to be lifted, because the contractor was able to fasttrack the delicate task they needed to execute.

He said that the initially scheduled 72 hours timeframe was achieved within 48 hours, hence the reopening to traffic 24 hours ahead of schedule.

“We have completed the casting of the three number expansion joints on Third Mainland bridge.

“Therefore, the bridge shall be opened at 12:00 midnight Sunday 27th December. and no longer Monday 28th December.

“That is 48 hours and no more 72 hours,” Popoola said.

NAN reports that the controller had on Tuesday, Dec. 22 announced a 72 hours total shutdown of the bridge with effect from midnight on Saturday to midnight Tuesday.

The shutdown was to stop vibrations caused by movement of vehicles for contractors to cast concrete on additional three expansion joints in the ongoing rehabilitation of the bridge.

NAN reports that the Third Mainland Bridge which was going through series of repairs, had to be partially shut on July 24 for another round of rehabilitation works.

The repair that was expected to last six months was extended by one month due to the recent #EndSARS protests in Lagos, thereby extending the completion date from January 2021 to February.

The construction was initially divided into two phases of three months on each carriageway, starting with the Oworonsoki bound carriageway whose completion dragged to four months.

Traffic was partially diverted on a stretch of 3.5km where construction is ongoing between Adeniji Adeniji Ramp and Ebute Meta, while different time belts were allotted for traffic diversions on the bridge.

The 11.8km bridge is the longest of the three bridges connecting Lagos Island to the Mainland.

The bridge starts from Oworonshoki, which is linked to the Apapa-Oshodi Expressway and the Lagos-Ibadan Expressway and ends at the Adeniji Adele Interchange on Lagos Island.

Constructed in 1990, the bridge was adjudged as the longest in Africa until 1996 when the Oct. 6 Bridge in Cairo, Egypt was completed.

©Copyright MOTORING WORLD INTERNATIONAL.
All rights reserved. Materials, photographs, illustrations and other digital content on this website, may not be reproduced, published, broadcast, rewritten or redistributed in whole or in part without prior written permission from Motoring World International

Contact[email protected]

Most Popular

NADDC DG, NGEP Chair, Innoson Chair, Others to Grace 2023 NAJA Awards

The Director General of the National Automotive Design and Development Council (NADDC), Joseph Osanipin, Chairman of Innoson Vehicle Manufacturing Co, Chief Innocent Chukwuma, and...

Amidst challenges, Honda Automobile Western Africa (Nigeria) Forges on 44 Years After

Despite economic downturn against manufacturing in the country, Honda Automobile Western Africa Ltd forges on after 10 years of operation in Nigeria and 8...

Race for 2023 NAJA Auto Awards Kicks Off, Event Holds Dec 14

The Nigeria Auto Journalists Association (NAJA) has slated its annual Auto Industry awards for Thursday, December 14 at the prestigious Oriental Hotel, Victoria Island,...

FRSC Vows 5% Road Crashes Reduction, as Biu Decorates DCM Bisi Kazeem

The Corps Marshal, Federal Road Safety Commission (FRSC), Mr Dauda Biu, says the corps is targeting 5% reduction in Road Traffic Crashes, fatalities and...